Between June 18 and June 20 2021, Plateforme 10 organised visits of the construction site of the building that'll house the Musée de l'Elysée and the mudac starting summer 2022. The building has been designed by the Portuguese architecture firm Aires Mateus.
The mudac will be located on the upper floor of the building, which seems to float above the common entrance hall on the ground floor and the Musée de l'Elysée on the lower floor.
mudac and Musée de l'Elysée construction site
mudac and Musée de l'Elysée construction site
Ground floor: Entrance Hall with its interesting prismatic roof
Upper floor: MUDAC
mudac construction
mudac construction
Lower floor: Musée de l'Elysée
Musée de l'Elysée staircase
Musée de l'Elysée staircase
The future restaurant
Back to Top